We – EPG Team the bigge EPT gearbox & motors , vee pulleys, timing pulleys, couplings and gears factory in China with 5 different branches. For far more specifics: Cellular/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778 0571 88828
2016 china producer 5 Ton Lifting Magnet Overhead Crane
Magnet Overhead Crane is a special crane equipped with electromagnetic chuck that utilised to carry iron or steel blocks&comma cylinders and so on&interval It consists of bridge&comma crane travelling system&comma trolley&comma electrical tools and electromagnetic chuck&time period Magnetic retentive can hold 10 minutes right after power shut&time period The form of electromagnet can be spherical&comma rectangle or sq.&comma which is developed in accordance to adsorptive merchandise&period of time
1&period of time Lifting substance&colon EPT EPT ingot&comma steel scraps&comma steel ball&comma metal billets
2&time period Wide use in metal plant&comma smelting plant&comma waste warehouse
3&interval Large operating performance&comma
4&period of time EPT performance&comma low upkeep
Ebon Overhead Cranes are available with a huge selection of personalized alternatives assisting with all dependable materials handling solutions&period of time Our crane provides an exceptional overall worth&interval Discover out more by electronic mail us&period of time
Configuration
2016 china company 5 Ton Lifting Magnet Overhead Crane
1- Lifting Mechanism
– Open up winch trolley mixed with motor&comma gearbox&comma hydraulic brake&comma drum&comma hook&comma sheaves&comma coupling&comma brake drum and so forth&time period
– Rigid box sort trolley body
– Wound Rotor 3-period asynchronous motor
– Harden Teeth Gearbox
– EPT Drum Brake
– Plate-rolled Drum kits
two-Conclude Carriages
– Solid Flanged wheel
– Rigid welded box variety beam
– Compact layout
3-Griders
– 2 main girders are welded box type
– Substance&colon carbon steel with high good quality of Q235B or Q345B
– The principal girder is connected by power bolt&time period
– Weld joint examined by X ray or ultrasonic examination&semi
– Modula design and style
– Made Deflection≤1&sol800 of span
4-Manage
– Cabin management
– Impartial pendent handle as option
– Wi-fi control as selection
5-Electric powered Element
– Conductor energy supply
– All hoi EPT and crane movements are impartial and can be run simultaneously&period
– Safety diploma IP55
– The factors are positioned in a maintenance friendly way&comma and the entire format provides with excellent defense
– Festoon cables are suspended on cable saddles&comma set to cable trolleys&comma running in a galvanized C-keep track of&time period
6-Painting
– Corrosion protection through ru EPT removing by mechanical shot blasting SA 2&period5
– Fir EPT layer of coating epoxy thirty microns
– Next layer of coating epoxy 30 microns
– Third Layer of coating of polyurethane forty microns
– Average thickness&colon about a hundred microns
– Shade&colon yellow or Orange as for each requirements
seven-Protected Safety
– Unexpected emergency-off change
– Overload shield
– Earth protection
– Zero Placement Safety
– Cross journey and prolonged journey safety
– Lifting travel safety
– Overheating safety of motor
– Outfitted with rainproof devices
– Alarm Bell and Lamp
Characteristics Benefits
2016 china company 5 Ton Lifting Magnet Overhead Crane
– Large obligation content handling
– Substantial efficiency
– Higher overall performance parts with economical price
– Affordable spare components
– 2 years warranty
– Easy maintenance and Simple alternative of elements
– Minimal co EPT of transportation co EPT and fa EPT set up
Lifting potential | t | 25&plus25 | ||||||||||
Span | m | 10&period5 | thirteen&period5 | 16&period5 | 19&period5 | 22&period5 | twenty five&period5 | 28&period5 | 31&period5 | |||
Max lifting Peak | 12 | |||||||||||
Speed | Hoisting | A5 | 7&period8 | |||||||||
A6 | 13 | |||||||||||
Trolley | m&solmin | 38&period5 | ||||||||||
Crane | A5 | 74&period6 | 86 | |||||||||
A6 | 86&period6 | 87&period3 | ||||||||||
Motor | Hoisting | A5 | YZR315S-8&sol85 | |||||||||
A6 | YZR355L&time period-ten&sol110 | |||||||||||
trolley | Variety&solKw | YZR160Mr6&sol8&period5 | ||||||||||
crane | A5 | YZR160L-6&sol13X2 | YZR200L8&sol18&period5X2 | |||||||||
A6 | YZR180L-8&sol11X2 | YZR200L-8&sol15X2 | ||||||||||
dimension | A5 | B | 8724 | 8842 | 9144 | |||||||
W | 6800 | 7000 | ||||||||||
B1 | 1262 | 1312 | 1362 | |||||||||
B2 | 662 | 712 | 782 | |||||||||
B3 | 1590 | |||||||||||
B5 | 128 | 1306 | 1331 | 1356 | 1381 | |||||||
B6 | 2412 | 2462 | 2612 | |||||||||
B7 | 1812 | 1862 | 2032 | |||||||||
Lx | 4500 &pm2 | |||||||||||
C | 2300 | |||||||||||
D | 2300- | -4500 | ||||||||||
E | 2000 | |||||||||||
H | 2726 | 2732 | ||||||||||
Hi | 1090 &plusHO | |||||||||||
H2 | 21 | 196 | 352 | 502 | 652 | &dollar2 | 902 | |||||
H3 | 2631 | 2626 | 2732 | 2882 | 3032 | 3182 | 3282 | |||||
b | 300 | |||||||||||
A6 | B | 8944 | 9571 | |||||||||
W | 6800 | 7000 | ||||||||||
B1 | 1362 | 1312 | ||||||||||
B2 | 782 | 712 | ||||||||||
B3 | 1540 | 1590 | ||||||||||
B5 | 1281 | 1306 | 1331 | 1356 | 1381 | |||||||
B6 | 2512 | 2562 | ||||||||||
B7 | 1932 | 1962 | ||||||||||
Lx | 4500 &pm2 | |||||||||||
C | 2300 | |||||||||||
D | 2300- | -4500 | ||||||||||
E | 2000 | |||||||||||
H | 2726 | 2728 | 2734 | |||||||||
Hello | 1090&plusHO | 1130&plusH0 | ||||||||||
H2 | 21 | 198 | 354 | 504 | 654 | 804 | 904 | |||||
H3 | 2631 | 2628 | 2734 | 2884 | 3034 | 3184 | 3284 | |||||
b | 300 | |||||||||||
Weight | trolley | A5 | 16&period7 | |||||||||
A6 | 17&period1 | |||||||||||
Total excess weight | A5 | 38&period2 | forty&period7 | 49&period3 | fifty three&period3 | fifty nine | 63&period1 | 68&period5 | ||||
A6 | 40 | 43 | 51&period8 | 56 | sixty two | sixty six | seventy one&period8 | |||||
Max wheel load | A5 | kN | 353 | 374 | 407 | 427 | 437 | 459 | 476 | |||
A6 | 356 | 377 | 415 | 433 | 443 | 466 | 483 | |||||
Steel track | trolley | P43 | ||||||||||
crane | QU80 or QU100 | |||||||||||
Power resource | 380V 50Hz 3-Section AX 380V 50Hz |
Tailor Produced
– Girder can be divided into parts and connected with bolts at internet site to reduce the transportation value
– Frequency converter techniques recognizing infini tel: +86~13 0571 88828y variable pace handle and minimal load swing for your precise loading and unloading specifications&time period
– Huge span in excess of 60m
– Substantial traveling pace for high functioning efficiency
Crane Inquiry Knowledge
Your type inquiry&comma Our sincere quotation&excl
CONTACT US | |
Wayne He | |
Mobile&colon &plus86~13083988828 13858117778770780269 | |
Telephone&colon &plus86 571 86253526 | |
Co&period of time Web site&colon http&colon&sol&solwww&periodshengqicrane&periodcom&sol | |
Our organization gives the support for overhead crane and gantry crane designing&comma creating&comma production&comma transporting&comma installation&comma operator coaching and servicing&time period For a lot more details and detai EPT about our items&comma which includes design and style of the crane&comma safety features of every kind of crane&comma software of the device&comma technical parameters of the crane&comma production procedure&comma soon after-sale services&comma principal portion of the crane&commapackage for the crane&comma loading images of cranes and all EPT details about our products&comma make sure you kindly get in touch with with MR&periodWayne &comma MR&periodWayne will give you a support as significantly as feasible&time period |
Crane Inquiry Knowledge Sheet | ||||||
Client&colon | ||||||
Day&colon | ||||||
Crane kind | Overhead Traveling Crane&lpar double girder or Single girder &rpar | |||||
Gantry Crane&lpar double girder or Single girder &rpar | ||||||
Ability &lparT&rpar | Primary Hoist | Aux&period of time Hoist | Bridge | |||
Necessary Hook Raise&lparM&rpar | Main hoist | Aux&time period Hoist | ||||
Runway Duration&lparM&rpar | ||||||
Duty Team | A1-A8 depends on your genuine needs | |||||
Raise Numbers | times for every hour | |||||
Operate hrs | hours for every working day | |||||
Ambient Temperature | Max&period of time | Min&time period | ||||
Material Managing | ||||||
Crane Operation | indoor | outside | ||||
Energy provide | Phase Volts Hz | |||||
Control Method | Cabin Floor Wireless | |||||
Special Components Desired | ||||||
Headroom Clearance &lparmm&rpar |
We – EPG Group the bigge EPT gearbox & motors , vee pulleys, timing pulleys, couplings and gears manufacturing facility in China with 5 distinct branches. For far more specifics: Mobile/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778 0571 88828 The use of original equipment manufacturer’s (OEM) part figures or logos , e.g. CASE® and John Deere® are for reference functions only and for indicating solution use and compatibility. Our business and the detailed substitute parts contained herein are not sponsored, approved, or created by the OEM.